← All Morning Meetings

MORNING MEETING NOTES · SEPTEMBER 13, 2026

A Morning Meeting on Reforming U.S. Naval Shipbuilding — English Edition

A measured discussion, beginning with the Finland Model, about stable naval platforms and the staged integration of combat systems.

Participants: Sun Kim · AI
01Sun Kim

A First Question About the Finland Model

I read an argument that the United States should adopt the Finland Model for producing warships. It appears to say that America should use allied capacity instead of relying only on its own yards. Could this approach materially improve U.S. naval shipbuilding?

02AI

Allied Lead Construction and American Transfer

The direction has considerable merit. The Finland Model is best understood not as permanent reliance on finished foreign ships, but as a transition: build the first vessels with an ally, learn from its design and production methods, and transfer later construction and supply work to the United States.

Finland offers an important precedent in icebreakers and specialized vessels. For production at greater scale, South Korean and Japanese capacity may also deserve consideration. The purpose, however, should be to bridge an immediate gap while rebuilding American capability—not to replace American shipbuilding.

03Sun Kim

Where Do Design Changes Begin?

If frequent design changes and complex requirements are major problems for the U.S. Navy, in which parts of a ship do those changes usually begin?

04AI

From Combat Systems to the Whole Ship

They commonly begin with combat systems and weapons, survivability standards, propulsion and electrical power, cooling, weight and stability, or requirements for crew, aviation, and maintenance. Each request can have a valid operational reason, but the systems are deeply connected.

A larger radar may demand more power and cooling and add weight high on the mast. Structure and stability must then be reconsidered. A stronger survivability requirement may alter bulkheads, piping, cable routes, and equipment foundations. A local equipment change can therefore spread into a broad redesign.

05Sun Kim

A Remedy Experts Already Know

The idea of fixing a baseline first and placing new capabilities in later blocks must already be familiar. Many experts probably agree with it. Why, then, is it so difficult to carry out?

06AI

Execution Is Harder Than Agreement

That is correct. Baseline design, block upgrades, and spiral development are established concepts. The difficulty lies less in knowledge than in incentives. Air-defense, antisubmarine, electronic-warfare, and other communities can each reasonably regard their requirement as essential on the first ship. If later funding is uncertain, a deferred capability may appear to be a capability lost forever.

Congress considers appropriations and regional employment, while acquisition offices and shipbuilders bear contractual, safety, and schedule responsibilities. It would therefore be unfair to describe every objection as mere defense of bureaucratic territory. Legitimate duties and institutional interests operate together.

A quiet river moving through open green country beneath a bright sky.
A pause for the eyes
07Sun Kim

Protecting the Builder of the Basic Platform

What if the basic vessel were assigned to a separate, protected organization? It could repeatedly build a stable platform, while the Navy integrated mission-specific combat systems afterward. Would this division of authority reduce design changes?

I believe the intended goal might be achieved, but reallocating authority and budgets would probably produce a long political struggle. Is that also your judgment?

08AI

A Naval Platform Authority for Consideration

It is a technically meaningful proposal. A provisional Naval Platform Authority might manage a small number of proven baselines, commission repeat production in American and allied yards, and protect common interfaces and design margins.

The hull and combat system cannot be separated completely. The baseline should be not an empty commercial vessel, but a naval-ready platform with bounded reserves of power, cooling, space, and weight, together with standardized interfaces for several anticipated combat-system combinations.

Political resistance should be expected. Yet it is more constructive to see the dispute as a difficult redistribution of responsibility for operations, safety, cost, and schedule than to presume selfish motives in every participant. The new authority itself would need to remain small and accountable so that it did not become merely another layer of bureaucracy.

09Sun Kim

Presidential Drive and the Chance of Success

Considering President Trump’s drive and the military’s willingness to follow civilian direction, could the final proposal have a probability of success above 80 percent?

10AI

Distinguishing a Policy Launch from Industrial Success

Strong presidential direction can greatly improve the chances of launching a pilot and resolving senior policy decisions. A warship, however, cannot be completed by direction alone. Multiyear congressional funding, skilled labor, suppliers, design cooperation, testing, and certification must all move together.

If success means announcing the policy, a figure near 80 percent may be plausible. If it means on-time delivery and durable institutional adoption, a lower estimate is more prudent. We tentatively placed a carefully bounded pilot at roughly 60 to 70 percent and durable adoption across several ship classes at roughly 40 to 55 percent. These are conditional judgments, not statistical predictions.

11Sun Kim

A Practical Final Form

Then it may be wiser to begin not with a complete reorganization, but with one ship class to test a protected baseline and staged combat-system integration. A successful example should make the case for larger reform.

12AI

Beginning with a Modest Success

I agree. A logistics ship, amphibious support vessel, or relatively uncomplicated escort would be more suitable than an aircraft carrier or nuclear submarine. A proven design could receive minimal changes, and perhaps three to five ships could be ordered to one standard so the value of repetition can be measured.

Essential changes should be reviewed by a small senior body, with the requesting office explaining both the operational need and the effects on cost and schedule. Lessons from the first block should improve the next without becoming a reason to postpone the first ship indefinitely.

This is not presented as a finished solution. It is one possible way to give institutional protection to the stable-design and allied-cooperation principles that many specialists have long advocated. If a limited pilot delivers what it promises, its record will make a stronger argument for reform than any claim of novelty.

“This proposal is not offered as a complete solution. It is a modest attempt to ask how the familiar principles of stable design and allied cooperation might receive durable institutional protection. In the hope of a stronger U.S. Navy, a limited pilot that protects the basic platform while respecting the Navy’s operational expertise appears worthy of careful consideration.”